  • Commodity name: Electromagnetic shielding cabinet
The cabinet adopts an overall frame welded structure, which can provide a space height of 42U (1U=44.45mm) for laying equipment components and can shield electromagnetic interference to provide protection for the equipment. Height: 42U (overall dimension: 2200mm (height) × 700mm (width) × 700mm~980mm deep. It supports mains and UPS power supply modes, and the Electromagnetic compatibility of shielding cabinet shall meet GB/T12190-2006 Technical Requirements and Test Methods of Electromagnetic Shielding Cabinet for Handling Confidential Information

Technical support:

  • 产品描述
  • 1. Overview

    The cabinet adopts integral frame welded structure, which can provide 42U (1U=44.45mm) of space height for deploying equipment components, and can shield electromagnetic interference to provide protection for equipment. Height: 42U (dimensions: 2200mm (height)× 700mm (width)× 700mm~980mm (depth). Support the two power supply modes of mains and UPS, and the electromagnetic compatibility of the shielded cabinet must meet the GB/T12190-2006 "Technical Requirements and Test Methods for Electromagnetic Shielding Cabinets for Processing Confidential Information"

    2. Use environmental conditions

    Working voltage: AC 220V

    Working temperature: 0°C~+40°C

    Storage temperature: -40°C~+55°C

    Relative humidity: 5%~80%

    Effective space distance of cabinet: ≥2m

    Computer room heat dissipation conditions: built-in fan

    Lightning protection and anti-static devices inside the computer room: The machine room needs to be equipped with grounding and lightning protection facilities

    3. The main functions and main indicators of the system

    The main function of the cabinet is to integrate all equipment inside the cabinet, which is convenient for installation, commissioning, maintenance and management, so that the cabinet becomes the carrier of equipment operation, so as to achieve efficient and safe working effects.

    The front door and rear door of the shielded cabinet (optional) are sheet metal doors (installed with electromagnetic shielding elastic material), one 1*300 waveguide window on the outside of the top, and a fan pack is installed; 300 1*300 waveguide window on the outside of the bottom, and a fan is installed on the inside; Inside the cabinet, 300 trays. Install a power filter (3A~16A) power filter (32A~7A) at the rear door of the cabinet; A 1-position PDU (260 pc) is installed, casters are mounted on the bottom, and the cabinet weighs about <>kg (excluding internal equipment).

    4. Product features and description

    (1). Good electromagnetic shielding performance: it can meet the C level requirements of GB/T12190-2006 required by users.

    (2). Cabinet structure description

    a). The inside of the cabinet can meet 19 inches, all equipment can be fixed on the shelf, and if the shelving equipment is less than the depth space of the cabinet column, it can be installed and fixed by the rack tray.

    b). The material is made of cold-rolled galvanized steel sheet, and the frame is fully welded to maintain the overall strength of the cabinet.

    c). Caster, which has the characteristics of flexible rotation, large load capacity, exquisite appearance and reliable quality, and its single load is 500KG, which can fully meet the load-bearing range of the cabinet during transportation and static.

    g). The blank baffle on the cabinet can also choose 1U\2U\4U and other different specifications according to the internal equipment.

    5. Installation of equipment inside the cabinet

    When all cabinets are installed and debugged on site, the internal equipment of the cabinet needs to be installed on the cabinet.

    a). According to the internal system equipment installation diagram of the cabinet, find the corresponding equipment, the installation equipment premise is to meet the standard 19-inch shelf requirements, if it is a non-standard product, it needs to be re-customized to the shelf panel or drawer to fix.

    b). When the equipment is installed, it is necessary to install the upper nut in the corresponding mounting hole.

    6. Terms of Use

    (1). Preparation and inspection before use:

    Before use, check whether the equipment installation parts are missing or damaged, such as PDU power supply wiring, terminal blocks, wire sheaths, grounding wires, and whether the front and rear doors rotate smoothly. At the same time, check the dust caused by the installation inside the cabinet, and blow it clean before use.

    (2). Operation method

    Check whether all cables are properly connected, the simplest tool is to use a screwdriver to check whether the cable ground is loose, so as not to cause poor contact at the joint and sparks. And check whether the wiring of all equipment in the cabinet is correct or missing.

    (3). Normal start-up procedure and warm-up time

    When the equipment is installed and inspected, the cabinet equipment can be powered on and gradually start all the equipment in the cabinet, if the humidity inside the computer room is high, it needs to be preheated for 10-30 minutes after powering.

    (4). Operating procedures, methods and precautions during operation

    When the equipment is running, if there is no abnormal situation, do not manually cut off the power, so as to cause data loss.

    7. Maintenance, maintenance

    (1). Maintenance cycle

    Generally, after the cabinet is in normal operation, it needs to be inspected once within 1-2 months, and inspection records need to be made for each inspection.

    (2) Normal maintenance procedures

    a). During the operation process, due to the long-term operation of the cabinet in the machine room, when the cabinet is merged and the equipment is installed, due to the insufficient levelness of the ground and the gravity of the equipment inside the cabinet, it is necessary to readjust the flatness after powering off the equipment, and the manufacturer can be notified for debugging if it is serious.

    b) When the equipment inside the cabinet is abnormal, operate according to the equipment instruction manual. In principle, it is to stop first, then power off, and then repair.

    (3) Maintenance, maintenance and sealing during long-term storage

    a). Check the storage environment, including temperature and humidity.

    b). It is necessary to pay attention to internal protection when storing it for a long time, because dust, insects and other debris accumulated over time affect the shelf life of the equipment.

     

    Electromagnetic shielding cabinet size
    serial number specification Form factor Inner net size remark
    1 42U-2 700*980*2200 468*900*1900 Class C
    2 42U-1 700*700*2200 468*650*1900 Class C
    3 37U-2 700*980*2000   468*900*1700 Class C
    4 37U-1 700*700*2000 468*650*1700 Class C
    5 33U-2 700*980*1850  468*900*1500 Class C
    6 33U-1  700*700*1850    468*650*1500 Class C
    7 26U-2 700*980*1550  468*900*1200 Class C
    8 26U-1 700*700*1550   468*650*1200 Class C
    11 20U-2 700*980*1250 468*900*900 Class C
    12 20U-1 700*700*1250 468*650*900 Class C
    13 14U-2 700*980*1000 

Inquiry

Note: Please leave your mobile phone or email, our professionals will contact you as soon as possible!

logo

Qingxian Penglong Chassis Co., Ltd. is a professional chassis cabinet manufacturer. Our company is strong. We not only have professional designers, but also have introduced complete sets of advanced equipment from Italy, Germany, Japan and other foreign countries, and developed a series of high-quality products on the basis of digesting and absorbing foreign product processing technology

Qingxian Penglong chassis Co., LTD

Contact: Mr. Yu
Tel:+86 13833737073
E-mail:yuzhaoyin4065601@163.com

Add: 200 meters west of 104 National Road Village, Gengguantun, Qingzhou Town, Qingxian, Cangzhou City, Hebei Province

Qingxian Penglong chassis Co., LTD www.300.cn City sub-station 

Business license
Tag

Search

Please enter the product name or keyword you want to view

product
  • All
  • product
  • news

Product customization

The product series is perfect to meet the different technical requirements and production process requirements of customers. Can be customized according to your special needs, to meet your individual needs.